The following activity will be occurring on I-5 over the next several weeks:

This week:

Nightwork (8 pm-5:30 am) to prepare for new signs will require shoulder and single lane closures.

Starting the week of March 16:

Drilling for new signs will begin Monday, March 16 and should be completed by Friday, April 10. This work will occur at night.

  • Drilling at I-5 NB @ Exit 298 / Corbett is scheduled to occur Mon 3/16 and Tues 3/17.  This work will require single lane and shoulder closures on I-5 NB between 8 pm – 5:30 am. The exit will remain open. 
  • Drilling at I-5 NB at MP 301.13 (just north of the I-84 ramp) is scheduled to occur Wed 3/18-Thurs 3/19.  This site will require a single right lane closure on I-5 NB and a single left lane closure on the I-84 on-ramp between 10pm – 5am. The I-84 on-ramp (Exit 300) will remain open.

News

Construction Update (09/30/2016)

Paving and sign work on Interstate 5 from SW Capitol Highway to N Lombard Street included replacing…

Construction Update (09/23/2016)

Paving and sign work on Interstate 5 from SW Capitol Highway to N Lombard Street included replacing…

Construction Update (09/16/2016)

Paving and sign work on Interstate 5 from SW Capitol Highway to N Lombard Street included replacing…


Want to see current road conditions on I-5?


Share